Tuesday, July 27, 2010

Bathroom Floor Tile

Today I installed the floor tile in the half bath. It literally took me all day to measure, cut, and install the tile. Cutting the tile was actually fun, thanks to the tile saw we borrowed from my Grandpa Bill. It was really easy and the cuts were perfect.


The hardest part was laying all of the tile without stepping on the ones that I already put down. To make sure the tiles were evenly spaced in the room, I had to start in the middle. If you can see the tile with the blue spacers laying on it, that is the one I started with. I then put down the tile above it, and worked my way to the left. Anyway, It was hard!
Kent and I were worried that the tiles would not be even, but I was able to get them pretty close to level. I tried really hard to follow all the directions and get the tile installed properly, but I am still worried they will crack. I guess we will just have to wait and see.


The room is really starting to come together.

No comments:

Post a Comment